Abstract: There is a potential landslide mountain in No.8 Community, Xiangji Village, Qingyi Town, Fucheng District. It is close to the Longmen Section of Mianjiang Road, where the daily traffic flow is nearly 20,000 vehicles. There were more than 200 meters of cracks in the cement pavement on the hillside, and nearly 100 meters of pavement at the foot of the mountain was crushed by the mountain cracking, causing the bricks on the ground to break and tip. A series of hidden dangers, threatening the safety of passing vehicles and pedestrians. Safety warning signs have been set up on this section.
There is a potential landslide mountain in No.8 Community, Xiangji Village, Qingyi Town, Fucheng District. It is close to the Longmen Section of Mianjiang Road, where the daily traffic flow is nearly 20,000 vehicles. There were more than 200 meters of cracks in the cement pavement on the hillside, and nearly 100 meters of pavement at the foot of the mountain was crushed by the mountain cracking, causing the bricks on the ground to break and tip. A series of hidden dangers, threatening the safety of passing vehicles and pedestrians. Safety warning signs have been set up on this section.
January 30, "Mian view hot one" reported "Landslides threaten Longmen Section of Mianjiang Road!6 years of" Observation ", how much longer "observation"? After reporting on the hidden mountain, how is the current rectification? In the morning of February 8th, the reporter came to the scene again to see that the foot of the mountain added 3 warning signs, and pulled up nearly 200 meters of the police line, the cement pavement cracking on the hillside also pulled up the police line for containment. In the interview, the reporter learned that after the media exposure, the Qingyi town government again invited the 909 geological survey team, the landslide hidden danger of the mountain survey, and issued a written geological disaster investigation and evaluation report. Fucheng District government also organized a special meeting with the district Natural Resources Bureau, Finance Bureau, Transport Bureau, Qingyi Town government and other units, and formulated a "three-step" renovation plan in the short, medium and long term based on the evaluation report.
Hu Yong, deputy mayor of Qingyi town, said the report issued by the 909 geological survey team showed that the hidden danger of the mountain is in a "basically stable - less stable" state, the risk is medium, the need to continue to strengthen monitoring and early warning. Therefore, the town government also added a monitoring personnel and 24 hours on duty personnel, further tamp the "civil air defense" foundation, earnestly do a good job of disaster prevention plan.
It is reported that the recent plan is mainly temporary and simple disposal measures, now all in place. Next, the medium-term plan will be around the repair ditch, crack backfill tamp, paving waterproof geotextiles and other work. Xie Bin, deputy director of Fucheng District's Natural Resources Bureau, said the long-term plan is to invite professional organizations to conduct another evaluation, and based on the evaluation results, immediately start comprehensive renovation projects to eliminate hidden dangers, and the overall project is expected to be formally completed by the end of 2022.